Local design features had to approved by the local building department to obtain the hard to get permits. This unique building was built in the H formation with a connecting lobby / reception and roof constructed at the factory and put in place on site.
•6 Classrooms
•Multiple stall restrooms
•Common area
•Drop in Lobby/ reception
•High efficiency heat / cool system
•Heavy insulation
•High roof load
Two independent classrooms with enclosed connecting bridge section.
Build required a very heavy snow load requirement for the Jackson Hole area.
Multiple boys' and girls' restrooms
Upgraded finishes throughout.
1-hour construction at lobby / reception.
Natural light in each classroom was essential