Complete heavy steel plate welded construction was the key factor in this gas control valve building for a refinery in Utah.
•Blast resistant
•Welded construction
•Heavy duty steel plate
Blast resistant construction including all specialty blast rated electrical and lighting,
All valving was installed at factory, delivered to site and hoisted 40 feet onto a scaffold where the final connections were made.